Re.strutture deployed its best workers on this site, in a constant interaction with the Project Management, ensuring the best technical and aesthetic implementation of the planned interventions. The interventions have already proven their effectiveness from a structural point of view, by blocking the ongoing deformation process, and from the point of view of inserting the introduced elements. The areas where work was carried out were: the bell tower with the rebuilding of its floor slabs, the insertion of chains at each deck and plastering; the apse of the left aisle, the bay in front and the portion of the façade-counter-façade bordering the bell tower (all areas affected by reinforced masonry injections and nailing and the insertion of chains); a portion of the wall of the right aisle affected by masonry injections. ‘Minimum intervention’ and the reversibility and compatibility of materials were implemented and guaranteed.